HomeStages › 4. Issue proposal

4. Issue proposal

PROC-C-S04-PROPOSE · Pursue · level 2 · gate · scope: engagement
Where the two rate cards do their damage. Two proposals issued in the same week can quote different rates for the same grade, and both are defensible internally.

Boundary

Trigger (in)
Conflicts checked, usually.
Output (out)
A proposal with a price.
Requires
none
Produces
none

Floor: can this run itself

Position
person
Manual because
risk
Basis
Assembled by hand from a previous proposal. Rates are taken from whichever card the author has.
Confirmed by
nobody named

Behaviour: what runs it

Systems
Proposals, Work product

Data

No data modelled for this stage.

Rules: what is decided here

No rules modelled for this stage.

Neighbours

Upstream
none
Every required state is produced upstream (out ⊢ in holds here).